10.5.2 Start Event
As the name implies, the Start Event indicates where a particular Process will start. In terms of Sequence Flows, the Start Event starts the flow of the Process, and thus, will not have any incoming Sequence Flows—no Sequence Flow can connect to a Start Event.
The Start Event shares the same basic shape of the Intermediate Event and End Event, a circle with an open center so that markers can be placed within the circle to indicate variations of the Event.
A Start Event is a circle that MUST be drawn with a single thin line (see Figure 10.70).
The use of text, color, size, and lines for a Start Event MUST follow the rules defined in “Use of Text, Color, Size, and Lines in a Diagram” on page 39 with the exception that:
The thickness of the line MUST remain thin so that the Start Event can be distinguished from the
Intermediate and End Events.
- 2.2Process Modeling Conformance
- 2.2.1BPMN Process Types
- 2.2.2BPMN Process Elements
- Common Executable Conformance Sub-Class
- 2.2.3Visual Appearance
- 2.2.4Structural Conformance
- 2.3Process Execution Conformance
- 2.3.1Execution Semantics
- 2.3.2Import of Process Diagrams
- 2.4BPEL Process Execution Conformance
- 2.5Choreography Modeling Conformance
- 2.5.1BPMN Choreography Types
- 2.6Summary of BPMN Conformance Types
- 3 Normative References
- 3.1General
- 3.2Normative
- 3.3Non-Normative
- Activity Service
- BPEL4People
- Business Process Definition Metamodel
- Business Process Modeling
- Business Transaction Protocol
- XPDL
- 4 Terms and Definitions
- 5 Symbols
- 6 Additional Information
- 6.1Conventions
- 6.1.1Typographical and Linguistic Conventions and Style
- 6.1.2Abbreviations
- 6.2Structure of this Document
- 6.3Acknowledgments
- Submitting Organizations
- 7.2BPMN Scope
- Understanding the Behavior of Diagrams
- 7.3BPMN Elements
- 8.3.4External Relationships
- Context-based Correlation
- 8.4.7Flow Element
- 8.4.14 Common Package XML Schemas
- 8.5Services
- 9 Collaboration
- 9.1General
- 9.2Basic Collaboration Concepts
- 9.2.1Use of BPMN Common Elements
- ParticipantAssociation
- 9.6Process within Collaboration
- 9.7Choreography within Collaboration
- 10.2 Basic Process Concepts
- 10.2.1 Types of BPMN Processes
- 10.3.7 Global Task
- Complex Behavior Definition
- 10.3.9 XML Schema for Activities
- 10.4 Items and Data
- 10.4.1 Data Modeling
- Item-Aware Elements
- Data Inputs and Outputs
- Data Output
- Assignment
- Execution Semantics for DataAssociation
- 10.4.3 Usage of Data in XPath Expressions
- Access to BPMN Data Objects
- 10.4.4 XML Schema for Data
- 10.5 Events
- Implicit Throw Event
- 10.5.2 Start Event
- Activity Boundary Connections
- Interrupting Event Handlers (Error, Escalation, Message, Signal, Timer, Conditional, Multiple, and Parallel Multiple)
- Non-interrupting Event Handlers (Escalation, Message, Signal, Timer, Conditional, Multiple, and Parallel Multiple)
- Handling End Events
- 10.5.7 Scopes
- 10.6.7 Gateway Package XML Schemas
- 10.7 Compensation
- 10.7.3 Relationship between Error Handling and Compensation
- 10.8 Lanes
- 10.9 Process Instances, Unmodeled Activities, and Public Processes
- 11 Choreography
- 11.1 General
- 11.4.2 Artifacts
- 11.5 Choreography Activities
- 11.6.3 End Events
- 11.7 Gateways
- 11.7.1 Exclusive Gateway
- 12 BPMN Notation and Diagrams
- 12.1 BPMN Diagram Interchange (BPMN DI)
- 12.1.1 Scope
- 12.1.2 Diagram Definition and Interchange
- 12.1.3 How to Read this Clause
- 12.2 BPMN Diagram Interchange (DI) Meta-model
- 12.2.1 Overview
- 12.2.2 Abstract Syntax
- 12.2.4 Complete BPMN DI XML Schema
- 12.3 Notational Depiction Library and Abstract Element Resolutions
- 12.4.5 Choreography
- 13.2 Process Instantiation and Termination
- 13.3 Activities
- 13.3.3 Task
- 13.3.4 Sub-Process/Call Activity
- 13.3.5 Ad-Hoc Sub-Process
- Operational semantics
- 13.3.6 Loop Activity
- 13.3.7 Multiple Instances Activity
- 13.5 Events
- 13.5.1 Start Events
- 13.5.2 Intermediate Events
- 13.5.3 Intermediate Boundary Events
- 13.5.4 Event Sub-Processes
- Operational semantics
- 13.5.5 Compensation
- Compensation Handler
- 13.5.6 End Events
- Process level end events
- 14 Mapping BPMN Models to WS-BPEL
- 14.1 General
- 15 Exchange Formats
- 15.1 Interchanging Incomplete Models
- 15.2 Machine Readable Files
- 15.3.1 Document Structure
- 15.5 XSLT Transformation between XSD and XMI
- B.1 Scope
- B.2 Architecture
- B.4 Diagram Interchange
- B.4.1 Overview